Every dry-break connector and valve undergoes helium mass spectrometer testing and hydrostatic pressure checks before packing. This high-vacuum verification replaces standard water-dunk checks, ensuring that spillage per disconnect meets the zero-tolerance leakage requirements of secondary cooling loops.
- 1.5–2× Working Limits & Vacuum Leak Detection






